Bookings, cut-offs, and AES before departure.
An export forwarder sells space it does not own, against a schedule set by someone else. The work is the booking, the shipping instruction, the cut-off board, the filing that must be in before the vessel sails, and a house B/L that must print from the same record the invoice will read. Four of the eleven steps in a forwarder’s day belong to this desk.
Five items the morning queue puts in front of this desk.
Ordered by the cost of leaving them alone, rather than by when they happen. The right column states what each one costs if it is left unattended.
Carrier cut-offs
3 cut-offs are already past and not met
The ones already past and not met, then the ones inside the next 48 hours. The ERD is counted on its own line and not mixed in, because a past ERD is good news: the window is open.
Party screening
Parties with no screening on record, and the age of the list they were checked against
Two questions, not one: which parties have never been screened, and how old the list was when they were. A check run yesterday against a list six months old passes any audit of the first question and has confirmed nothing.
The age of documents
Everything with an expiry date, soonest first
Powers of attorney expiring. Bond and IAC renewals. Claim deadlines. Rate tables about to expire — an expired table cannot price at all. Links sent to a customer, expiring.
Money leaking quietly
Six ways money stops moving, on one list
Delivered more than 45 days ago and never invoiced. Shipments with no delivery date, which never age at all. Receivables past credit terms — and the customers with no credit terms set, where this system says it cannot tell whether they are late. Credit applied against an invoice that does not exist. Email that never went out.
AES, before departure
Commodity lines off the shipment, the pre-check, then the file
Commodity lines off the shipment, the pre-check, then the AESTIR file at 80 bytes a line. ACE WebLink reads the ITN back onto the shipment, and a rejection back with its reason.
Three systems, two extensions, and a short list of what stays off.
A system that is off has no menus, rather than greyed-out ones, and is not billed.
SCM
QMS
ABI
Party screening
Connect
What stays off
The cut-off board, with the ERD counted apart.
One row per master, the filing state on the same line, and two dates that are never added together because they mean opposite things.
| Master | Lane | SI cut-off | ERD | AES |
|---|---|---|---|---|
| AMCM-2609-00714 houses | LAX → SIN | 01 Sep 17:00 PastNot met | 29 AugWindow open | No ITNFile not sent |
| AMCM-2609-00742 houses | LGB → HKG | 03 Sep 12:00In 41 hours | 31 AugWindow open | ITN recorded02 Sep 08:11 |
| AMCM-2609-00797 houses | LAX → ICN | 05 Sep 17:00 | 04 SepNot yet | RejectedCommodity line 3 |
| AMCM-2609-00831 house | OAK → SYD | 06 Sep 10:00 | 03 SepNot yet | Not started |
Two dates, counted apart
A cut-off is a wall that can be hit. An ERD is a door that opens. They are both dates on the same master, and a screen that treats them the same way is worse than no screen, because it is confidently wrong.
One of the twenty release checks (check_deadline_floor) stops a build that clips the bottom of a warning at today. The moment a passed deadline drops off the board is exactly the moment it stops being a warning and starts being a bill.
Forty-five minutes on a real shipment.
One export is taken from quotation to invoice, on a demonstration company or on a copy of the forwarder’s own spreadsheet. Difficult lanes are welcome. The session ends with a written quotation.